Crestmoor

  • Completion Date: April 2026
  • Location: Nashville, TN
  • Project Type: Demolition/Earthwork

About this Project

Our Crestmoor project consisted of demolishing a 25,000 sq.ft. 2-story building in a busy area of Green Hills. By the time the demolition was complete, we were 3 weeks ahead of schedule. Following the demolition,
we began grading and line drilling.

Highlights:

  • 9,600 linear ft of line drilling completed to depths up to 20 feet.
  • Successfully excavated and exported 30,000 cy of dirt and rock material.
  • Installed two 8in gravity sewer lines across a multi-lane road into the property, requiring traffic control, trench safety systems, and live utility crossings.
  • Connected sewer infrastructure to existing municipal systems with proper slopes, bedding, and backfill requirements per local and TDOT
    specifications.
  • Selective demolition of Air Freight Buildings 1 & 2.
  • Interior demolition in the Main Terminal including baggage claim secured areas.
  • Completed work on schedule with no lost time to airport.
  • All LEED and DBE requirements met.

    Site Conditions:

    • Selective demolition throughout civilian and secured areas while the airport remained active
    • Adapt daily to constantly changing availability of work zones and change scheduled tasks to accommodate for such
    • Night work required for much of the demolition
    • Stringent background requirement for all employees had to be met.