1620 Corporate Place
- Date Completed: March 2023
- Location: LaVergne, TN
- Project Type: Demolition, Earthwork, & Site Utilities
About this Project
Site preparation for property located in an active industrial corridor of LaVergne TN that will be home to a 25,900 square foot warehouse.
Scope of work included site demolition, mass excavation, site grading, and installation of storm sewer.
Highlights:
• 15,000 cy of mass excavation
• Rock hammering for utilities
• Import of material for parking lot
• Installation of bio-pond
• Installation of storm sewer structure
Site Conditions:
• Winter excavation presented moist clay conditions
• Storm sewer pipe installed into an extremely sloped bank