1620 Corporate Place

  • Date Completed: March 2023
  • Location: LaVergne, TN
  • Project Type: Demolition, Earthwork, & Site Utilities

About this Project

Site preparation for property located in an active industrial corridor of LaVergne TN that will be home to a 25,900 square foot warehouse.
Scope of work included site demolition, mass excavation, site grading, and installation of storm sewer.

Highlights:

15,000 cy of mass excavation
Rock hammering for utilities
Import of material for parking lot
Installation of bio-pond
Installation of storm sewer structure

Site Conditions:

Winter excavation presented moist clay conditions
Storm sewer pipe installed into an extremely sloped bank