Crestmoor
- Completion Date: April 2026
- Location: Nashville, TN
- Project Type: Demolition/Earthwork
About this Project
Our Crestmoor project consisted of demolishing a 25,000 sq.ft. 2-story building in a busy area of Green Hills. By the time the demolition was complete, we were 3 weeks ahead of schedule. Following the demolition,
we began grading and line drilling.
Highlights:
- 9,600 linear ft of line drilling completed to depths up to 20 feet.
- Successfully excavated and exported 30,000 cy of dirt and rock material.
- Installed two 8in gravity sewer lines across a multi-lane road into the property, requiring traffic control, trench safety systems, and live utility crossings.
- Connected sewer infrastructure to existing municipal systems with proper slopes, bedding, and backfill requirements per local and TDOT
specifications. - Selective demolition of Air Freight Buildings 1 & 2.
- Interior demolition in the Main Terminal including baggage claim secured areas.
- Completed work on schedule with no lost time to airport.
- All LEED and DBE requirements met.
Site Conditions:
- Selective demolition throughout civilian and secured areas while the airport remained active
- Adapt daily to constantly changing availability of work zones and change scheduled tasks to accommodate for such
- Night work required for much of the demolition
- Stringent background requirement for all employees had to be met.