Jetway Logistics
- Completion Date: June 2026
- Location: Nashville, TN
- Project Type: Demolition/Earthwork
About this Project
This turnkey project required Demo Plus to separate and demolish an 800,000 sf multi-floor warehouse built in the 1940’s. We demolished it all in only 2 months, while we worked to complete both pads ahead of schedule with over 30 pieces of heavy equipment operating at any given time. Concurrently recycling 5,000 tons of steel, crushing with our mobile crushing equipment over 250,000 tons of concrete on site, removing over 20 30-yard boxes a day of C&D waste, importing 180,000 cubic yards of material used for the grading of both large building pads, and site utilities for state fire lines looped around both buildings.
Highlights:
- Safely demolished 800,000 sf of office space and warehouse
- Recycled 30,000 tons of concrete for reuse
- Roof had 300,000 sf of ACM
- Roof had 80 ft. long trusses, 2-inch-thick steel, weighing 65,000 lbs. each, with 5,000 tons of Steel recycled
- C&D waste totaling 20,000 yards of material removed
- 180,000 cubic yards of material imported
Site Conditions:
- Challenges of working next door to BNA Airport
- 300,000 sf of asbestos removed
- Many undisclosed basements found throughout structure no as-builts
- Congruently crushing, demolishing, and building pads
- Peak crew sizes hit 40+ employees working at one time
- Bore underneath Briley Parkway