Nashville Federal Courthouse

  • Completion Date: February 2022
  • Location: Nashville, TN
  • Project Type: Abatement, Demolition, Utilites

About this Project

Contracted to provide excavation services, backfill, and installation of site utilities for the new Nashville Federal Courthouse that was in the heart of downtown Nashville. We demolished four buildings as part of the site preparation. Debris from a prior building demolition many years ago was found buried underground that required removal. Unforeseen asbestos and contaminated soils were removed.

DBE: 100% (required project goal of 25%)
SBE: 100% (no required project goal)
WBE: 5% (no required project goal)
MBE: 5% (no required project goal)

Local Subcontractors/Suppliers: 100%

Highlights:

Site preparation covering over 4 acres for the new federal courthouse
20,000 cy of material crushed on site, reused as fill, and compacted back into site
38,000 cy of mass excavation
Contaminated soil remediation
Demolition of a 5-story, 80,000 sf building
Demolition of an 8-story, 128,000 sf parking garage
Excavation for NES electrical vault
Installation of sewer, storm, and watermain utilities
Diverted 89% of material from landfill

Site Conditions:

  • Highly congested down area requiring multiple lane closures
  • Brought in asphalt millings at night that were placed on the street while we operated and removed
    each morning
  •  Debris found buried underground from demolition of building several years ago that had contaminated
    soils which had to be remediate