Smash
- Completion Date: JUNE 2026
- Location: Nashville, TN
- Project Type: Demolition/Earthwork
About this Project
This sizeable project started in a heavily wooded area right off Brick Church Pike with very little access. We cleared all 9 acres of trees and four existing structures by demolishing, blasting over 80,000 CY, and grading. Operations of both site grading and demolishing happened simultaneously during this process. We brought the site to grade utilizing over 160,000 CY of material that was crushed onsite utilizing our mobile crushing equipment. Then we added 2 retaining walls and over 2,800 ft of storm sewer.
Highlights:
- Demolition of the four existing buildings
- Over 80,000 CY of blasting
- Balanced site over 160,000 CY of onsite materials
- Installed 2,800 Linear feet of storm sewer with 68 structures
- Installed two retaining walls
- Strict blasting schedule
Site Conditions:
- Coordinating operations between both compacting structural fill while simultaneously demolishing
- Not disturbing creek at the front of the property
- Small roadway was the only access in off Brick Church Pike